Marina Technology and Construction Pte Ltd was founded in Singapore in 1991, followed by MTC Malaysia in 1996. Throughout  the  years, MTC seeks to pursue  unconventional yet innovative ideas to optimise resources and to continuously acquire new skills, equipment & technology. Having implemented these strategies over the last 25 years and in keeping consistent efficiency and productivity at a high level of standard, MTC is actively present at the competitive front of the industry.

MTC is registered with Building & Construction Authority (BCA) Contractor & Licensed Builder Workhead CW02 Civil Engineering; Specialist Licence CR08 Piling Works.  Areas of her expertise include Design & Build Civil Engineering-Marine Works and Marina and Floating Pontoon Specialist.  With creative initiatives and innovative solutions, MTC has completed a number of unique projects, amongst which include the floating restaurant at Fullerton Pavilion for Sino-Land; Conference Pods at Fullerton Bay Hotel and the Floating Platform at Semakau Landfill for the National Environment Agency.

MTC is proud to have played a significant role in the joyous Singapore SG50 celebration in 2015 by successfully completing the iconic Jubilee Bridge at Marina Bay for URA ahead of time.  It is with great pleasure to share that the Jubilee Bridge has won two awards in 2016 ACES Design Excellence and Merit award for C&S category. In the same year, as part of NEA’s Semakau Landfill Phase II, the completion of a very large (200m x 20m) Floating Platform by MTC has enabled the Nation to increase its dumping capacity up to year 2035 and beyond.

In her pipeline, MTC has plans to expand her Middle East business to better serve the Gulf Region. In Singapore, MTC is seeking to venture into new business development such as large floating structures for commercial/residential purposes.

MARINA TECHNOLOGY AND CONSTRUCTION PTE LTD
120 Lower Delta Road #12-08 Cendex Centre Singapore 169208
Tel +65 6278 1948  Fax +65 6278 1947  
Email: mtc@marinatechnology.com